Pre-Demolition Asbestos Abatement in Redmond

Typical cost in Redmond

  • Asbestos survey before tearing down a house$800 – $2,000+
  • Abatement of a whole house before tear-down$10,000 – $30,000+

A Redmond teardown cannot start until the asbestos is dealt with. We arrange the survey, the filing with the Clean Air Agency and the removal, and your demolition crew can begin once 10 days have run from the notice.

The city’s demolition submittal packet lists two items that depend on this work, an abatement report from the removal company and a notification filed with the Puget Sound Clean Air Agency. It also says any structure over 200 square feet needs its own demolition permit. We prepare teardowns in Redmond, Cottage Lake and Medina.

Request a free quote
Older wood-sided house behind a chain-link fence, prepared for demolition, with a plastic-lined dumpster, wet gravel and fir trees under an overcast sky

By kind of building

Whole houses

A roof over 120 square feet means a notice to the agency, with or without asbestos, and then a 10-day wait. Crumbly asbestos comes out before the walls do.

Garages and sheds

Two thresholds apply, the city’s own permit above 200 square feet and the agency’s notice above 120 square feet of roof. A small shed still needs a survey by an accredited inspector.

Partial demolition

A porch or an addition coming off is a gray area. Demolition, in the agency’s language, leaves a structure permanently unusable, and anything less counts as renovation. The portion being removed is surveyed in both cases.

Buildings from 1950 to 1980

City guidance for buildings built or renovated in those years asks owners to assess suspect materials, such as floor and ceiling tiles, caulking, coatings and sealants, for PCBs before demolition. PCBs are a separate question from asbestos, worth raising early.

What the permit file needs

Take Redmond’s list as a starting point. Not every item applies to every address.

The abatement report

The packet asks for the report from the asbestos removal company. Decide who will write it before the application goes in.

The agency filing

File early, because the 10 days count from it. The city’s waste rules let applicants follow either the agency’s asbestos rules or L&I’s project notice.

The waste

Asbestos leaves the site with a shipment record, headed for an authorized facility. Two sites on the agency’s list take King County waste from outside Seattle, and the home page names them.

Empty room sealed for asbestos abatement with walls, floor and windows covered in clear plastic sheeting

See also asbestos testing and surveys and rental and apartment abatement.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (425) 675-7767

Call (425) 675-7767