Example Asbestos Removal Projects in Redmond

See how a Redmond asbestos job comes together, from the first samples to the last bag hauled away. The examples cover wallpapered rooms, ceilings, a half bath, an older house in Medina and an apartment building, each with its timeline and cost.

Survey of wallpapered rooms before painters strip the paper

Example project

Home
1970s two-story house in Cottage Lake with wallpaper in the dining room, the hall and the powder room
Original request
Strip the wallpaper and repaint the three rooms
Testing
About 9 samples of the paper, the paste and the wall finish under it, taken at loose edges
Found
Asbestos in the joint compound under the paper in the dining room and the hall
Clear
The wallpaper, the paste and the powder room walls test clean
Timeline
One visit by the inspector, then a written report within a few days
Estimated testing cost
$700

Scope of work

The inspector's visit, about nine samples taken at loose edges of paper with each spot patched, lab fees and a written report that marks the positive walls. Removing those walls, if the owners want it, is priced separately.

Project overview

In this example, the owners of a 1970s house in Cottage Lake plan to strip the wallpaper in the dining room, the hall and the powder room and repaint. Stripping wets and scrapes the wall, and sanding usually follows, so the painters ask for a test of the wall under the paper first.

The compound under the paper in the dining room and the hall tests positive. Stripping and sanding will disturb it, so the owners leave the paper on those two walls and paint over it. The powder room is clear and the painters go ahead there.

The goal

The goal is a sorted list of the walls that can be stripped and the walls that stay covered, before a painter picks up a scraper.

Process

  1. Before the visit Photos of the walls and of the corner of paper the painters lifted to see what was underneath.
  2. Visit About 9 samples of paper, paste and wall finish, taken where the paper is already loose.
  3. A few days later A report that clears the powder room and marks the dining room and the hall.
  4. Then The painters start in the powder room, and the two positive rooms wait for a decision.

Planning right

  • Paper and paste can be clean while the wall under them is not.
  • Sampling at a loose edge keeps new damage small.
  • A wall that nothing will cut or sand can stay as it is and be painted over.
  • Tell the painters before they pick up a scraper.

Get a free quoteMore about asbestos testing and surveys

Textured ceiling taken down in a spare room that becomes a home office

Example project

Home
1970s two-story house in Redmond
Original request
Turn the spare bedroom into a home office with track lights and acoustic panels
Testing
The ceiling texture went to the lab and came back positive
Area
About 160 sq ft of ceiling
Work
Spare room emptied and sealed, texture wetted and scraped off, once the notice to the clean air agency is in
Timeline
Notice, then one working day
Cost
$1,900

Scope of work

A lab test, a notice to the clean air agency, the spare room emptied and sealed, the light fixture taken down, the texture wetted and scraped into sealed bags, and a vacuum and wet wipe. Disposal is included. A skim coat, lights and paint are extra.

Project overview

In this example, the owners of a 1970s house in Redmond turn a spare bedroom into a home office for video calls. They plan track lights and acoustic panels on the ceiling, and screws into sprayed texture spread it, so they ask for a test first.

The texture tests positive. The ceiling is about 160 sq ft, more than the 48 sq ft that calls for a notice, so the notice goes in first and the room is cleared in one working day.

The goal

The goal is a bare ceiling in the spare room, ready for the track lights and the panels.

Process

  1. First visit A sample of the texture; the room measured.
  2. Before work The notice is filed and the spare room cleared down to the bare walls.
  3. Work day Plastic goes up, the texture is wetted and scraped off, and everything is bagged and wiped down before the plastic comes out.
  4. Then The electrician and the painter return to a bare ceiling.

Planning right

  • Screws and anchors into texture break it up, so test before any hardware goes up.
  • Choose the ceiling finish before the crew comes, so the surface is left ready for the lights.
  • One room can be a notice job, since 48 sq ft is only a small patch.
  • Put the lab report in the folder with the house records.

Get a free quoteMore about popcorn ceiling removal

Sheet vinyl and felt backing taken up in a half bath, just under the notice size

Example project

Home
1970s two-story house in Redmond with a half bath off the kitchen
Original request
A new vanity, toilet and floor in the half bath
Testing
The vinyl and its felt backing sampled near the toilet flange; the backing is positive
Clear
Plywood under the backing is clear
Area
About 45 sq ft of floor, under the 48 sq ft that calls for a notice
Timeline
One day of work before the plumber returns
Cost
$1,600

Scope of work

Separate samples of the vinyl and the backing, the half bath sealed with plastic and a filtered air unit, the vinyl and its backing wetted and lifted in strips, sealed and labeled bags, a HEPA vacuum and disposal. The new vanity, toilet and floor are extra.

Project overview

In this example, the owners of a 1970s house in Redmond want a new vanity, a new toilet and a new floor in the half bath off the kitchen. The sheet vinyl is the original, and the plumber asks what is under it before the old toilet is pulled.

The felt backing tests positive. The floor is only about 45 sq ft, under the 48 sq ft that calls for a notice, but the wet method and the sealed room still apply, and any other friable material taken out of the house that year counts toward the same total.

The goal

The goal is bare plywood in the half bath before the plumber returns.

Process

  1. First visit A sample of the vinyl and the backing taken near the toilet flange; the floor measured.
  2. Work day The toilet and vanity come out, the room is sealed, and the vinyl is wetted and lifted in strips with its backing.
  3. Same day Strips go straight into labeled bags, the floor is vacuumed and wiped, and the plastic is rolled up.
  4. Then The plumber sets the new toilet and vanity on a bare plywood floor.

Planning right

  • Under 48 sq ft is a small job, but it is still handled wet and bagged.
  • Count every other ceiling, floor and wall job at the house that year, since the yearly total decides the notice.
  • Do not roll dry vinyl back to look. A corner is enough.
  • Small rooms often carry a minimum charge, since setup and containment cost the same as in a bigger room.

Get a free quoteMore about floor tile and sheet vinyl removal

Boiler wrap, floors and a sprayed ceiling cleared from an older house before it is replaced

Example project

Home
1940s two-story house in Medina with a basement boiler, a family room added in the 1960s and a detached garage
Original request
Take the house down and build a new one
Testing
An accredited inspector takes about 30 samples from the house and the garage
Found
Asbestos in the wrap on the basement boiler and pipes, the kitchen and bath floors and the sprayed family room ceiling
Clear
The plaster walls, the siding and the garage test clean
Timeline
Survey, then the notice with the 10-day wait, then about six days of removal
Cost
$15,000

Scope of work

Everything positive removed before demolition, meaning the boiler and pipe wrap, about 400 sq ft of floor tile and glue and about 350 sq ft of ceiling texture. Rooms are sealed in turn, waste is bagged and labeled, an air check follows and the loads go to an authorized site. The survey and the wrecking are not included.

Project overview

In this example, the owners of a 1940s house in Medina plan to replace it with a new one. A family room was added in the 1960s and the heating changed over the years, so the survey covers the whole house and the detached garage.

The wrap on the basement boiler and pipes, the kitchen and bath floors and the sprayed ceiling of the family room test positive. The plaster walls, the siding and the garage are clear. Everything positive comes out before the wrecking crew starts, and the 10-day wait runs alongside.

The goal

The goal is a house with its boiler wrap, floors and family room ceiling cleared, so the new build starts on schedule.

Process

  1. Survey About 30 samples from the house and the garage, and a report that measures the boiler wrap, the floors and the ceiling.
  2. Notices Removal and demolition notices go to the clean air agency, and the 10 days count from there.
  3. Removal The basement first, for the boiler and pipes, then the kitchen and baths, then the family room ceiling.
  4. Handover A final air check, then the loads go to the disposal site and the lot goes to the wrecking crew.

Planning right

  • Ask the City of Medina's permit office about the teardown permits.
  • Boiler wrap comes off before the boiler is cut out or moved.
  • Keep one folder for the survey, the notices and the shipment records.
  • Book the haul early, since the disposal sites set their own hours and paperwork.

Get a free quoteMore about pre-demolition abatement

Ceilings and floors cleared in a vacant apartment that becomes a fitness room

Example project

Building
1970s three-story apartment community building in Redmond, 24 units, one ground-floor unit vacant
Original request
Turn the vacant ground-floor unit into a fitness room for residents
Testing
An accredited inspector takes ten samples inside the vacant unit
Found
The sprayed ceilings and the kitchen and hall sheet vinyl both test positive
Clear
No asbestos in the walls, the bath floor or the carpet pad
Area
About 750 sq ft of ceiling and 200 sq ft of floor
Timeline
Survey, then the notice, then about five days of removal
Cost
$8,500

Scope of work

A survey of the unit, a notice to the clean air agency, a sealed work area with a filtered air unit that keeps the neighbors out of the dust, a certified crew, the texture soaked and scraped and the vinyl lifted into sealed bags, an air check before the unit reopens, and disposal. The fitness room finishes are extra.

Project overview

In this example, the manager of a 1970s apartment community in Redmond wants to turn a vacant ground-floor unit into a fitness room for residents. Owner-occupant shortcuts do not reach a rented building, so an accredited inspector surveys the unit first while the neighbors stay in their homes.

The sprayed ceilings and the kitchen and hall sheet vinyl test positive. A certified crew seals the unit, takes out the texture and the vinyl, and clears it before the fitness equipment arrives.

The goal

The goal is a bare, clean unit for the new fitness room, finished without moving any tenants.

Process

  1. Survey Ten samples from the vacant unit, and a report that measures its ceilings and floors.
  2. Before work Notice filed; neighbors told the days, and the hallway and the haul route marked.
  3. Days one to four The unit stays sealed under a filtered air unit while the ceilings and the vinyl come out.
  4. Last day Air check, final clean, and the unit handed back to the manager.

Planning right

  • The same texture may hang in the neighboring units, so a survey of one unit is not a survey of the building.
  • A vacant unit is the easiest part of an occupied building to seal off.
  • Shipment records belong in the building file.
  • Ask the crew which certified supervisor will be on site every day.

Get a free quoteMore about rental, condo and apartment abatement

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (425) 675-7767

Call (425) 675-7767